HMO Conversions

HMO conversions, built to licence .

HMO conversions and refurbishments across Cheshire and the wider North West. Compliant fire strategy, room sizing, multiple bathrooms and certified electrics — delivered to a standard that passes local-authority licensing first time.

Why Choose Us

Compliance is not a corner to cut.

The fastest way to lose money on an HMO is to build it now and have to pull it apart later. Inadequate fire doors, undersized rooms, the wrong number of bathrooms — any one of these means a licence refusal or a remediation bill. We build HMOs to local-authority standard from day one.

We work for landlords and investors across Cheshire and the wider North West, deliver to a fixed programme, and hand over the documentation pack the licensing officer wants to see — EICRs, gas safety, fire-detection commissioning and building-control sign-off.

What's Included

A licensing-compliant build.

From layout setting-out to final commissioning — every part of an HMO build that the licensing officer will check, delivered properly and documented.

  • Layout & Room Sizing

    CAD layouts that meet minimum room-size requirements for the relevant licensing authority, including communal space.

  • Fire Strategy

    FD30 doors, mains-interlinked detection, fire-rated plasterboard upgrades and a protected staircase — to LACORS guidance.

  • Kitchen Installations

    Communal or per-room kitchenettes, properly ventilated, with adequate cooker and storage allocations per occupant.

  • Multiple Bathrooms

    Compliant bathroom-to-bedroom ratios, fully tanked wet rooms or shower rooms, NICEIC-certified electrics.

  • Boosted Hot Water

    Unvented cylinders or commercial-grade boilers sized for simultaneous demand from multiple bathrooms.

  • Sound Insulation

    Acoustic-grade insulation between rooms and floors — so the HMO works as a place to actually live.

  • Electrical Upgrades

    New consumer units, EICR, RCD-protected circuits and individual lockable rooms wired to local-authority spec.

  • Documentation

    EICRs, gas safety certificates, fire-detection commissioning records and building-control sign-off — handed over for licensing.

How We Work

Design to Completion.

A single accountable team, start to finish. No handoffs, no subcontractor blame-games, no surprises.

  1. 01

    Consultation

    We listen to your brief, your timing and your budget — by phone or in our office.

  2. 02

    Site Visit

    A free on-site walk-through of the space so we can scope feasibility and constraints honestly.

  3. 03

    Quotation

    A detailed, itemised quote with no hidden costs and no obligation to proceed.

  4. 04

    Design & Planning

    Where required: full design, planning submissions and building regulations — handled in-house.

  5. 05

    Project Delivery

    Our trusted long-standing team and specialist trades deliver to the agreed programme and standard.

  6. 06

    Completion

    Final inspection, snagging and handover — backed by our written workmanship guarantee.

Frequently Asked

HMO Conversion FAQs.

The questions landlords and investors ask us most often before commissioning a conversion.

Do you handle the HMO licence application?

We work alongside your appointed letting agent or licensing consultant — we don't submit the licence ourselves, but we deliver the build to a standard that meets local authority licensing requirements first time. Most of our HMO clients use a specialist consultant for the application.

How much does an HMO conversion cost?

A typical 4–6 bed HMO conversion (existing house, no major extension) runs £45,000–£95,000 depending on the structural work, kitchen and bathroom counts, and fire-strategy requirements. Larger 7-bed-plus or sui-generis schemes can exceed £140,000.

What does the fire strategy involve?

FD30 fire doors with intumescent strips and self-closers, mains-interlinked smoke and heat detection, fire-resistant plasterboard upgrades, protected staircase and clear means of escape. We work to LACORS / local-authority HMO guidance.

How long does a conversion take?

Typical programme is 10–18 weeks on site, depending on the existing layout, the number of new bathrooms and the extent of structural changes. Strip-out and first-fix usually run 6–8 weeks; second-fix and finishing the rest.

Do you work for landlords and investors?

Yes — most of our HMO clients are landlords or investors operating across the North West. We'll deliver to brief and budget on a tight programme, with a written workmanship guarantee on completion.

What Our Clients Say
CDB have knowledge and experience they use wisely to achieve great outcomes. They are competent, experienced, knowledgeable, friendly, trustworthy, communicative, considerate, and hardworking.
M. Harrison Full House Renovation · Alderley Edge
Checkatrade 9.8 · Read all our verified reviews
Let's Build Something

Planning an HMO conversion?

Share your floor plan or property details. We'll arrange a site visit and come back with a fixed-price quote and a programme that fits your refinance or letting timeline.